Concrete · Paget, QLD
Type
Concrete
Size
640 m²
Duration
3 weeks
Completed
2024
Problem
A workshop owner needed a heavy-duty slab that could take forklift traffic and machinery without cracking inside 12 months.
Solution
Engineered 200 mm slab on compacted base, double-mat reinforcement, sawn control joints, and a hard-burnished finish.
Result
Poured in a single day, trafficable inside a week, and still mark-free 18 months on.